METROPOLITAN RAPID TRANSIT ORANGE LINE PROJECT
Ensure the accuracy of the design calculations and design details drawings.
Coordinate with the Architecture team, Interface team to compatibility check the architectural works, Interface works (E&M), and temporary works before producing the working drawing.
Ensure those construction drawings are available on time for the construction team.
Planning and preparing the stage for concrete pouring and reinforcements.
Coordinate and supervise subcontractors to comply with the project requirements.
Coordinate with the team and provide technical support on relevant issues in order to complete the project effectively in a timely.
Preparing Material take off for cost estimate.
Design Temporary work and minor construction to facilitate for the structure.
A weekly report summarizes the progress of the work.
มิถุนายน 2556 ถึง กันยายน 2561
Civil Engineer
บริษัท ช.การช่าง (ลาว) จำกัด
เขื่อนไซยะบุรี แขวงไซยะบุรี สปป.ลาว
สำหรับสมาชิกเท่านั้น
XAYABURI HYDROELECTRIC POWER PROJECT
Scheme and created shop drawing (shop drawing & bar bending schedule) by AutoCAD and ensuring that all safety, quality and necessary based on construction specifications and requirements.
Quantities take-off of concrete work, formwork, and reinforcing bars.
Design temporary work structures and facilities for the construction site included precast formwork, special formwork, and Belt Conveyor foundation.
Construction supervision, which follows the standard quality and duration specified according to a master schedule.
Coordinate with relevant subcontractors to ensure the operation is smoothly continuing without interruption.
The construction process ensures safety in the workplace.
Assisted design manager in construction technical issues on the site instructions report.
The report summarizes the progress of the work to report to the supervisor.