- Prepare Manufacturer data record (MDR)
- Performed NDT (VT/PT/MT/UT/RI)
- NDT (VT/PT/MT/UT/RI) Interpretation about indicator in Weld metal
- Welder Qualify Test (WQT) / Procedure Quaifucation Record (PQR) / Welding Procedure Specification (pWPS/WPS)
- Hydrostatic Test / Pressure Test / Air Leak Test / Full water Test
- Inspection In-Process about Steam Boiler / Pressure Vessel Fabrication
- External Audit & Internal Audit ISO 9001
- Improvement about Welding Robot
- Creating Calibration plan and Validation Calibrate Tools
- Standards used for work
Accordace ASME Section IX / ASME Section VIII / ASME Section I
- Prepare Manufacturer data record (MDR)
- Performed NDT (VT/PT/MT/UT/RI)
- NDT (VT/PT/MT/UT/RI) Interpretation about indicator in Weld metal
- Welder Qualify Test (WQT) / Procedure Quaifucation Record (PQR) / Welding Procedure Specification (pWPS/WPS)
- Inspection the Welding consumables amd Raw materials incoming into the factory.
- Prevent, find causes and solve problems related to Welding work.
- Monthly welding defect KPI report
- Conducting training and Providing guidance to welders every week
- Hydrostatic Test / Pressure Test / Air Leak Test / Full water Test
- Inspection In-Process about Steam Boiler / Pressure Vessel Fabrication
- External Audit & Internal Audit ISO 9001 / Renew factory certificate PED / AD2000 Merblatt / EN ISO 3834 / U-Stamp / S-Stamp
- Produce and creating Inspection test plans according to European and American standards.
- Inspection witness point following Inspection test plans with Notified Body (TUV/LRQA)
- Creating Calibration plan and Validation Calibrate Tools
- Have worked on products CE-Mark (PED) / U-Stamp / S-Stamp
- Standards used for work
Accordace ASME Section IX / ASME Section VIII / ASME Section I
Accordance EN ISO 9606-1 / EN ISO 15614-1 / EN ISO 12593 / EN ISO 12952 / AD2000 Merkblatt / PED