- Planning and Control Overall Preventive Maintenance Machines /
Heavy Vehicles since Process Perlite Explained to Mixer and Final
Mortar Products
- Planning and Control Standard Spare Part & Special Spare Part
- Planning and Control Construction Project / Installation Machines /
Utilities
- Planning and Control MTTF, MTBF, MTTR
- Planning and Control maintenance costs
- Improvement Capacity Machines / Layout Machines / Layout
Factory building
- Coordinate for Improvement Machines Follow up Request Quality
Department about CAR
- Prepare & Review Work Instruction / Procedure Manual / Work Standard / Machine registration & Machine Flow Diagram
- Planning Skill matrix and Training the new staff
Reduce Scrap in Process , Improvment Process
- Design Hand Tool, Prepare Flow Rework
- Engineering Test , Material Test , Soldering Test
- Key Condition , Coordinate CQM
พฤศจิกายน 2558 ถึง กุมภาพันธ์ 2560
Project Engineer
CR Asia (Thailand) Co., Ltd.
15/1 Moo3, Bankoh-Mabkha Rd, T.Mabkha, A. Nikompattana, Rayong 21180
สำหรับสมาชิกเท่านั้น
CCR2 Catalyst Unloading Project
Area : TOC 4
Description : Catalyst Unloading Under Nitrogen (3 Bed) and Internal Clean Under Air
- Site survey, Shop Drawing Check, Schedule plan
- Lifting Plan, Prepare Method Statement, Mobilization&DeMobilization
- Recheck Set-up Vacuum Tool & Equipment/BA Tool
- Recheck %LEL , Benzine, Nitrogen
- Control Work Follow Method Statement
กุมภาพันธ์ 2556 - ตุลาคม 2558
Rayong Maintenance & Contracting Co., Ltd.
169 M.3 T.Nikompattana A.Nikompattana Rayong 21180
Mechanical Engineer
Owner: Bangkok Indrustrial Gas Co.,Ltd.
1. BIG 4" Gas N2 Pipeline and Gas N2 Meter Station Project
Area: SCG Chemicals Co., Ltd. (Site#3ROC ISBL) to SCG Chemicals Co., Ltd. (Site#7MOC)
Description : Gas pipeline N2 on pipe rack
- Piping Work Tie-in 8 x 4" for Route line 4” to Gas Meter Station distance 3.0 km
- Modify piping and component
2. BIG-PTTGC6 Gas O2 Pipeline Project
Area: Map Ta Phut Industrial Estate (I8 Road) Pipe Bridge I8-BX-3 to I8-BX-4
Description : Gas Underground Pipeline O2
- Gas Piping Work and Steel Structural work, (HDD) Horizontal Directional Drilling
Work for Underground Pipeline 4” to Aboveground Pipeline for Tie-in 6x4" ,Fabrication and
installation platform for operating existing 8” valves
* Owner: Bangchak Petroleum Public Company Limited
1. Replace Shell Fire Heater 3F – 101 Project
Area : Refinery Plant #3
Description : Turnaround for Replace Shell Fire Heater
3F – 101
- Maintenance Furnace 3F- 101 for Replace Shell Fire Heater
- Modify Steel Structural temporary support
- Modify piping and component
- Remove / Cleaning & installation Burnner
*Owner: Thai Oil Public Company Limited
1. Piping Work For Hil Project
Area : TPX Plant
Description : Remove & installation for Maintenance Heat Exchanger Including the Insulation
- Remove Pipeline existing
- Modify Steel Structural temporary support
- Modify piping and component
- Maintenance Heat Exchanger
- Pressure Test
*Owner: IRPC Public Company Limited
1. Improve wax processing HDPE Project
Area : HDPE Plant
Description : Design, supply and installation, as well as the pipe and modify Sign glass to Tank No. 14.031
- Shop Drawing and Erection follow Schedule plan
- Modify piping and component
- Modify Sign glass
- Remove Pipeline existing
ประวัติการฝึกอบรม
มีนาคม 2554 ถึง พฤษภาคม 2554
สถาบัน ไทย-เยอรมัน
ฝึกงาน
ความสามารถ
ความสามารถทางภาษา
พูด (ดี) อ่าน (ดี) เขียน (ดี)
พูด (พอใช้) อ่าน (พอใช้) เขียน (พอใช้)
ไทย คำ/นาที อังกฤษ คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,
Computer Skill : Solid Work, Unigraphics NX , Autodesk Inventor, Moldex3D, Rhinoceros
Caesar II , M.S.Office ,SEEDS , CAD/CAM/CAE/CNC