- Review the Bill of Material, drawing and manufacturing spec provided by customer and submit the proposal to customer to update to match existence in production line and for yield improvement, cost reduction and/or RMA reduction.
- Review the First article of new material, perform the Fit-Form-Function for the FA report and analyze data to verify product performance after implementing new material.
- Create work instruction and process document for production line and keep updating the documents for yield improvement, cost reduction and/or RMA reduction.
- Responsible for production line to achieve manufacturing key performance such as yield, ship to commit and cost reduction.
- Support operation running in the term of product yield to accomplish delivery, quality and competitive cost.
- Be transferred for new products from NPI to mass production phase, set up system for mass run, release instruction documents and keep monitoring from the beginning to smoothly run as mass product.
- Perform the Product troubleshooting and release troubleshooting guideline to technician with training and be a consultant for technician to solve hard core issues in the of product troubleshooting.
- Analyze data in depth to find out the root cause that make product yield drop and fix it urgently to get yield back as soon as possible. Improve and maintain the Product yield to be always on target
- Responsible for the special request or experiment from customer as technical coordinator and provide data analysis to customer as well.
ประวัติการฝึกอบรม
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (พอใช้) อ่าน (พอใช้) เขียน (พอใช้)
ไทย คำ/นาที อังกฤษ คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
PROJECT ACHEIVEMENT :: FABRINET
Yield Improvement at Final Test for model GBK
• GBK products had low yield from failure mode Tilt, Noise Figure and Ripple. It caused high test factor and low Test bench capacity efficiency. The yield and Test Factor has been improved by use the new Coil Target Calculation. The cost saving from this project is 0.43 Tester (97.50K USD).
Endface polishing rate reduction
• The average yield of endface inspection was 91.16% which it impacted to high polishing rate and high polishing cost. The endface inspection yield has been improve to 95% and got total cost saving 0.6K USD per Quarter.
Capacity ramp up
• Set up and qualify Operation Pigtail Assembly, Pigtail Mate, FIP and Assembly for supporting the Capacity ramp up plan