Chatrium Grand Bangkok, 32 Floors 2 buildings
- Coordinate and contact with Main contractor and Owner
- Control job to follow master plan schedule
- Distribution the job for worker
- Installation and checking equipment Air condition System and Ventilation System
- Commisioning and Testing Chiller Plant, Cooling Tower Plant ,Cooling Tower Water Treatment,FCU , AHU , Ventilation Fan
- Operated Chiller Plant for service Owner and Owner Customer
- Maintenance and Service equipment Air condition System and Ventilation System
Between before hand over and In warranty
- Training Staff Owner for Operated Equipment
Panorama Restaurant Crowne Plaza Bangkok Lumpini park 23 Floor
- Distribution the job for worker
- Coordinate and contact with Main contractor and Owner
- Installation and Renovated Equisment Hot water , Cold water , Drain pipe , Sewerage pipe , Gas
- Commisioning and Testing Sanitary
มิถุนายน 2560 ถึง กรกฎาคม 2560
Internship
EGAT
Sirikit Dam 40 Moo 10 Pha Leud Sub-district, Tha Pla District Uttaradit Province 53150
สำหรับสมาชิกเท่านั้น
Maintained and Monitored equipment for Hydro Powerplant with EGAT Staff.