Improved productivity of packing process.
Design new working steps of process.
Performed other tasks as assigned.
กรกฎาคม 2560 ถึง มีนาคม 2564
Eng. Spec.4 or senior Eng.
ROHM Integrated Systems (Thailand) Co., Ltd. Pathumthani
นิคมอุตสาหกรรมนวนคร
สำหรับสมาชิกเท่านั้น
Defective reduction and zero defect.
Save production cost such as test new raw material cheaper than present material, but the quality of work is the same or better than before.
Develop quality Micro Chip Resistor.
Improve efficiency capability and working.