49 Village No.6 ,Nikhom Lam Narai Sub-district, Chai Badan District, Lop Buri,, 15130
สำหรับสมาชิกเท่านั้น
- Machinery PM Planning
- Procure spare parts and plan the annual shutdown event
- Maintain machinery, analyze and solve problems when a breakdown occurs.
- Drawing Design Piping, Pipe Support, Pump and Other
- Estimate BOQ, Price and Management Project, Plan, Time, Expenses, Quality and Worker
- Drawing Design Truss Structure, Column, Gate, Fence, Tower Tank Water and Build in MACS CO., LTD.
- Maintenance Yoshimine Boiler, Superheat, Air Duct, Cyclone, Blank Tube Drum, Ash Hopper, Economizer, Soot Blower and Check Coupling Motor in Eastern Sugar and Cane CO., LTD.
- Install Ash Pipe Systems for Biomass Power Plant 55 MW in Buayai Bio Power CO., LTD.
- Install Actuator on-off Damper Air Duct and Adjust for Biomass Power Plant 55 MW in Buayai Bio Power CO., LTD.
- Drawing Design Air Duct Systems, Build and Erection for Biomass Power Plant 55 MW in Buayai Bio Power CO., LTD.
- Build and Erection Stack High 80 m. for Biomass Power Plant 55 MW in Buayai Bio Power CO., LTD.