Piping Engineer Scope
- Pressure Test @400 Bar in CNG Cylinder Tank
- Pressure Test @350 Bar in Steam System
- Progress Schedule.
- Material Checking.
- Prepare Procedure for installation.
- Prepare Procedure for Hydrotest.
- Prepare NDE Method.
- Prepare Document and Package.
- Drawing Modify for actual Installation.
- Open work permitted and Prepare JHA.
- Follow Up Schedule for Installation
Proposal Engineer
- Breakdown Material.
- BOQ Calculation.
- Open PO&WO by Mango ERP for Construction.
- Prepare RFQ and Calculation Manpower
- Compare BOQ and Estimate Price
- Mango ERP Program
Marubeni Thailand & SIEMENS.
Project: SBRP1: South Bangkok Power Plant Replacement Project Phase1 (Shutdown Power Plant)
Scope: Follow Up Schedule for Replacement part of Power Plant.
BLACK & CEATCH / Italian Thai Development PLC.
Project: BPRP1: Bang Pakong Combined Cycle (Unit 1-2 Replacement)
Scope: Plan and Follow up schedule, Prepare Document for Inspection and Hydrotest.
TPSC (Thailand) Co., Ltd.
Project: ABP5 Combined Cycle Cogeneration Plant Project (Shutdown Power Plant)
Scope: Follow Up Schedule for Replacement part of Power Plant.
• Reviewed ITP and QA/QC procedure
• Material vertification and receiving inspection
• Prepare and Review WPS/PQR (Welder Procedure Specification & Welding Procedure Qualification Report.
• Controlled inspection and NDE Pressure part & Steel work according to project specification and international code standards.
• Issue Procedure support Project, Job Specification, PWHT for alloys.
• Fabrication and Final Inspection Tank & Vessel according to ASME Section VIII (U Stamp).
• Fabrication and Final Inspection Boiler and Pressure Vessel according to ASME Section I (S Stamp).
• Reviewed refractory lining procedure and installation refractory work.
• Prepared all inspection records document.
• Prepared Manufacturing Data Book.
• Control progress follow schedule.
• Co-ordinate with fabrication team and client.
• Attend meeting with main-contractor and clients & problem solving.
• QA/QC Measuring instrument calibration
• Issue Material inspection report (Specification, Type, Heat no., Lot no., etc.)
• Reviewed NDE report, Job specification.
• Reviewed Painting procedure and issue painting report.
- Project No. P959023/ Corpus Christi Liquefaction (CCLNG) – Train 3
PETRO-CHEM DEVELOPMENT CO., INC
- Project No. P761015/ V17518 – MSU Rojo, V17519 – MSU Villa Maria - Argentina
Vogt Power International