Feb 2018 – Present Project Engineer Starlink (Thailand) CO., LTD.
Project Reference
Feb 2018 – Apr 2019
1. Project : UHU2 – UNCC AIR HANDLING UNIT UPGRADING PHASE 2
Location : United Nations Building Rajdamnern Nok Avenue Bangkok 10200 Thailand
Owner : UNESCAP
Project description : Install AHU 48 unit, Piping work, Ducting work, Upgrading BAS system, and Testing and commissioning.
Feb 2018 – Apr 2019
2. Project : Laboratory renovation at 7th floor
Location : Shell head office 10 Soonthornkosa Rd., Klongtoey, Bangkok 10110.
Owner : NGI
Project description : Install Split Type Air Conditioner 7 unit, and testing.
July 2019 – Aug 2019
3. Project : TISCO AHU TEST PHASE 1
Location : TISCO Tower 48/2 North Sathorn Road Bangrak Bangkok Thailand 10500
Owner : TISCO
Project description : AHU Performance Test 4 unit.
Aug 2019 – Sep 2019
4. Project : Supply and installation of Split Type Air Cooled at Mixing room 2
Location : 88 Moo 7 , Buengthonglang , Lumlukka , Pathumthani 12150
Owner : Pronova Laboratories
Project description : Install AHU 1 unit, Piping work, Ducting work, and Testing and commissioning.
Oct 2019 – Nov 2019
5. Project : Correction of condenser pump NO.3
Location : United Nations Building Rajdamnern Nok Avenue Bangkok 10200 Thailand
Owner : UNESCAP
Project description : Shaft alignment, Modify water pump impeller, and Testing and commissioning.
Jan 2020 – Apr 2020
6. Project : AHU control valves replacement
Location : United Nations Building Rajdamnern Nok Avenue Bangkok 10200 Thailand
Owner : UNESCAP
Project description : Install AHU control valves 15 unit, Piping work, Upgrading BAS system, and Testing and commissioning.
Jan 2020 – May 2020
7. Project : Installation of room temperature and CO2 sensors at UNCC building
Location : United Nations Building Rajdamnern Nok Avenue Bangkok 10200 Thailand
Owner : UNESCAP
Project description : Install temp sensors 36 unit, Upgrading BAS system,
Mar 2020 – Aug 2020
8. Project : KITCHEN LEVEL 1ST FLOOR
Location : United Nations Building Rajdamnern Nok Avenue Bangkok 10200 Thailand
Owner : CPF Restaurant and Food Chain Co,.Ltd
Project description : Install heat pump 4 unit, Kitchen's plumbing system.
Mar 2020 – June 2020
9. Project : Installation of HEPA Filter and Modification of Air Handling Unit
Location : United Nations Building Rajdamnern Nok Avenue Bangkok 10200 Thailand
Owner : UNESCAP
Project description : Install HEPA Filter on AHU 9 unit, Adjust air flow.
Aug 2019 – Sep 2019
10. Project : Supply and installation of Split Type Air Cooled at Mixing room 2
Location : 88 Moo 7 , Buengthonglang , Lumlukka , Pathumthani 12150
Owner : Pronova Laboratories
Project description : Install AHU 1 unit, Piping work, Ducting work, and Testing and commissioning.
Sept 2020 – Oct 2020
11. Project : ปรับปรุงห้องแยกโรคผู้ป่วยติดเชื้อทางอากาศ Negative pressure ชั้น 2
Location : 1500 Ekkachai Rd, Mahachai, Mueang Samut Sakhon 74000
Owner : Samut Sakhon Hospital
Project description : Install 4 set of EXU, OAU, FCU and CDU, and Testing and Commissioning.
Sept 2020 – Jan 2021
12. Project : Supply and installation of refrigerated garbage store at UNESCP
Location : United Nations Building Rajdamnern Nok Avenue Bangkok 10200 Thailand
Owner : UNESCAP
Project description : Install cold room ± 5 ° C Size m. (2.5 x 5.3 x2.8), and Testing and commissioning
Dec 2020 – May 2021
12. Project : Supply and installation of refrigerated garbage store at UNESCP
Location : United Nations Building Rajdamnern Nok Avenue Bangkok 10200 Thailand
Owner : UNESCAP
Project description : Install water tank, make-up pump and transfer pump, upgrade BAS
Monthly
13. Project : Preventive maintenance cooling tower and chiller
Location : United Nations Building Rajdamnern Nok Avenue Bangkok 10200 Thailand
Owner : UNESCAP
Project description : General check, Wipe clean, Performance test