o Set Group Solutions Co,Ltd. 2019 2021
Position: MA Motorway Project Coordinator
Responsibilities:
1. Preventive and Corrective Maintenance Management in
1.1 Fiber Optic network between Central Control Building to Toll surveillance building.
1.2 Electrical system for traffic surveillance equipment which installed on motorway.
1.3 Traffic surveillance equipment such as Traffic CCTV, Emergency telephone.
1.4 Generator and auto transfer switch system.
1.5 Internet Protocol Telephone (NEC).
2. Monthly meeting with customer for work progress, problem and troubleshooting.
o CS Plastmach Co,Ltd. 2017 2018
Position: Service Engineer
Responsibilities:
1. Coordinate with customer and machine supplier for installation and commissioning work.
2. Primary machine troubleshooting and coordinate with machine supplier for solution and spare part.
3. Technical support to customer.
o Flotech Engineering Co.Ltd. 2015-2016
Position: Maintenance Technician
Responsibilities:
1. Machine troubleshooting in Automation unit, Inverter and Servo
Motor.
2. Control system modification for improve existing machine to
Support new product and new production procedure.
3. Control system design, engineering, installation and commissioning
for new machine such as molding machine, drilling machine.
4. Coordinator for machine and factory facility improvement work.
5. Technical support for production in electrical and automation.
o Rayong Engineering Plant and Service Co,Ltd 2010-2015
Position: Instrument (Control) Engineer
Responsibilities:
1. Yogokawa DCS and Safety PLC system maintenance and modification for new HDPE and PP Plant (2010-2013)
2. Siemens PLC revamp from S5 to S7 of blown film machine in design, engineering, installation and commissioning.
3. Existing PP Plant expansion DCS and Safety PLC programming. (2012)
4. Electrical Control Panel of transferring and mixing machine. Scope of work are design, engineering, installation and commissioning(2012)
5. Advisor for Tank and Jetty control system revamp project from Yogokawa CS1000 and GE PLC to Yogokawa Centum-VP and Prosafe RS PLC.(2012-2013)
6. Control system Turnaround maintenance management for HDPE and PP Plant (2013)
7. Automatic Catalyst Feeding system for PP Plant project engineering and commissioning, (2013)
8. Extruder PLC and SCADA modification as per production request.
9. Siemens PLC revamp from S5 to S7 of bagging and palletizer machine. Scope of work are existing machine study, new system design, engineering, installation and commissioning.(2014)
10. PVC compound weighting and mixing plant control system revamp from weight controller to PLC Siemens PLC S7 and WinCC SCADA for production information management. Scope of work are design, engineering, installation and commissioning. (2014-2015)
11. General maintenance and information support for field instrument maintenance team and production department.
o Thai Polyethylene Co,Ltd 2008-2010
Position: Construction Engineer (Instrument) for new Propylene plant.
Responsibilities:
1. DCS, ESD, FGS system engineering both hardware and software.
2. Vendor and EPC coordination and project schedule control.
3. Factory Acceptance Test witness at vendor shop.
4. Site installation supervise and site acceptance test witness.
5. Field instrument loop test support.
6. Commissioning and Start up support.
7. DCS, ESD, FGS, PLC system modification support.
o Neuman & Esser South East Asia Co,Ltd 2007-2008
Position: Instrument Engineer
Responsibilities:
1. Instruments Specification, documents and procurement support to project engineer.
2. Control Panel, PLC Panel specification and procurement support to project engineer.
3. Site installation and commissioning for instrument and control system work.
4. Compressor start up and modification work for instrument and control system.
o Rayong Engineering Plant and Service Co,Ltd 2004-2007
Position: Instrument Engineer
Responsibilities:
1. Yogokawa DCS and GE PLC system maintenance and modification for Tank and Terminal Plant.
2. Control System (PLC, SCADA, HMI) Engineering, installation and commissioning for new Pipe Compound plant.
o Chan Charen Foam Co,Ltd. 2001-2004
Position: Maintenance Technician
Responsibilities:
1. New machine installation and expansion project support.
2. Maintenance and modify EPS Shape Molding Machine.
3. EPS Cutting Machine Operation and Maintenance.
4. Steam Turbine and Generator Operation.
5. Electronic Part Repairing.
ประวัติการฝึกอบรม
ความสามารถ
ความสามารถทางภาษา
พูด (ดี) อ่าน (ดี) เขียน (ดี)
พูด (พอใช้) อ่าน (พอใช้) เขียน (พอใช้)
ไทย 20 คำ/นาที อังกฤษ 20 คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,
Internet and Network System
SCADA Software in Cimplicity (GE Fanuc)
Wonderware (Invensys),WinCC (Siemens),
PLC Engineering software in GE Fanuc, Mitsubishi, Modicon , Siemens
Visual Basic6 for Database Programming.
Touch Screen Proface, Siemens Configuration and Generation
Yogokawa Centum CS3000,Centum VP,Prosafe RS Programming
Mitsubishi HMI,Servo Motor