My responsible had Supervised sub-contractor and technician team working for electrical and mechanical system.
Today i'm freelance for M&E work scope about drawing and clarify to shop and supervised M&E
MEC Engineering Co., ltd I am M&E supervisor. I have duty about contract tender (Quotation-BQ-Dwg) to be tender so that manage team to follow contract too.
TK FACTORY TRANG Project. (Phase I) There are production line for natural rubber factory so these have 12.5MW (If full requirement also Phase II in future) value about 56mb. EE contract.
STA-FACTORY 51 NARA-THIWAT there are production line for rubber factory so these have 2.3MW value about 14.5mb. EE contract.
Non Thong Lang station project inside Track Doubling Project (For Transportation and Logistics Section: Chira junction Khonkaen) JV-CKCH. There are Train station so these have M&E of this project value about 10mb. Currently working here.
Working time initial September Sep.2015 to present
Parabolic Co.ltd I am senior general foreman of electrical system follow Solar Photovoltaic power plant project at PETCHABOON province from Jan 2015 to Apr 2015. (8MW)
ประวัติการฝึกอบรม
ความสามารถ
ความสามารถทางภาษา
พูด (ดี) อ่าน (ดี) เขียน (ดีมาก)
พูด (พอใช้) อ่าน (ดี) เขียน (ดี)
ไทย 45 คำ/นาที อังกฤษ 45 คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
- Good for use computer
2D AutoCAD 2000 series
Microsoft window (MS Office- Excel, Word , Picture manager, PowerPoint ) MS-Project,
Internet explorer ,
Adobe Acrobat 9pro+
Superviser M&E proceed initial prepare shop Drawing until as-built drawing with handover package of Mechanical & Electrical system HVAC Sanitary - Fire protection - Electrical & Communication system
- I'm worked Quantity Surveyor and estimation of M&E so i can Compare and Prepare
- I'm Understand about QA/QC procedure system to be fair.
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
*******INITIAL FIELD AUTO-CADD*******
1993 - 1994 - Vetcha‐tani Hospital Bangkok Project
Bangkok
1994 - 1995 - Bobae tower Project
Bangkok
1995 - 1996 - Yala Chang-Lee hotel project
Yala
1996 - 1997 - Bangkok‐Hadyai Hospital Project
Songkla
1997 - 1999 - Big‐C Department Store Project
Petchburi - Lopburi - RamaII Bangkok
1999 - 2003 - General Fruit Farms -
Around southern border provinces of Thailand
*****NEXT FIELD OF CONSTUCTION*******
2004 - 2006 With 139 Engineering CO., LTD.
Bangkok Airways Cargo Project (Suwanabhumi Airport)
Samutrprakarn
Home Pro‐Tesco Lotus Village Bang‐plee Project
Samutrprakarn
Office Depot Bangkae Project
Bangkok
2006 - 2013 with CHRISTIANI & NIELSEN (Thai) PCL
1.Six sense Erawan Distination Retreat Spa & Resort Project
2.Laguna Bayan tree 2‐Bedroom Pool Villas Project
Phuket
3.Bhumiratchanakarindra Kidney Institute project (Hospital)
Bangkok
4.Technology innovation & Various operation center MU Project
Bangkok
5.Makro Super Store Project
Ayuttaya Satoon
Responsible for the Document control of QA-QC system of the following projects:
2009 PTT‐LNG Storage Tank Project
Rayong
2012 Michelin Factory HTY Project
Songkla
2013 - 2014 with BOUYGUES THAI CO.,LTD.
Solar Photovoltaic Power Plant Project
Tak
****FIELD M&E CONSTRUCTION MANAGEMENT***
On 2014 with EEC Engineering network Co.,Ltd
to - Songkhla Biomass Power Plant Project
On 2015 with JC Builder Co.,Ltd.
Prepare Document to tender.