1 Support document
- Design and execute qualification URS, RA, DQ, IQ and OQ
- Review work instructions WI and standard operating process SOP
2 Spare parts
- Prepare and manage the annual maintenance budget and forecasts
- Controlling spare parts
3 Preventive corrective maintenance
- Design schedule for PM plan
- Manage the overall of machine
1.Primary processing machine Mixing, Bottle filling and Tube filling
2.Secondery processing machine Labeling, Cartoning and Shrink
- Manage the overall of facility
1.HVAC System Chilled Water , Air Conditioning and Ventilation
2.Water System Purifier Water, Factory Water System and Soft Water System
3.Compressed Dry Air
4.Gas System
5.Fire Protection, Fire Alarm, CCTV
6.High Voltage, Transformer, Low Voltage and Small Power Distribution
- Monitoring and controlling maintenance job
4 Purchasing
- Coordination with the purchasing department to order spare parts Liaise between
purchasing and Supplier
Plant Engineer
- Control the budget regarding the maintenance in the fourth quarter
- Schedule for Plan Shut Down (Daily, Monthly, Yearly)
- Control spare parts for M/C (Staple Machine, Note Pad Machine, Wrapping Machine
and Tinting Machine)
- Coordination with the purchasing department to order spare parts: Liaise between
purchasing and Supplier
- Aprove: Work Order for Break Down M/C
- Design PM Checklist : Autonomous Maintenance Standard (Cleaning, Checking,
Lubricating) for Machine
- Establish Overall Equipment Effectiveness (OEE)
- Maximo System: Create Purchase Requisition/Stock Receive /Stock tranfer
- SAP MM System: Create Purchase Requisition/Stock Receive /Stock tranfer
Assit. to CEO
- Reporting : something unusual is happening each day to the chief
- Analyses and improve the process,
สิงหาคม 2552 ถึง สิงหาคม 2554
Production Engineer ( Back side Progressive Lens Department)
- Analyses and improve the process, line balancing, waste reduction with Value
Stream Maping and A3 Report.
- Calibrate and control the CNC(Lathe,Polish), Laser Engraving, Auto taper,
Auto Blocker.
- Establish Overall Equipment Effectiveness (OEE) for the CNC(Lathe,Polishing).
- Establish a document (ISO9001:2000) for new product.
- Establish the Barcode System for Laser Engraving.
- Approve: release or acceptance nonconformity prior to export.
- Inspec product(lens): 100%Inspection
ประวัติการฝึกอบรม
สิงหาคม 2562 ถึง สิงหาคม 2562
TIPA
Qualification of Pharmaceutical Systems and Equipment
กุมภาพันธ์ 2561 ถึง กุมภาพันธ์ 2561
ISPE Thailand
Applied Risk Manage for Commissioning & Qualificatetion
กันยายน 2552 ถึง กันยายน 2552
EISQUARE
LEAN MANUFACTORY
ความสามารถ
ความสามารถทางภาษา
พูด (ดี) อ่าน (ดี) เขียน (ดี)
พูด (ดี) อ่าน (ดี) เขียน (ดี)
ไทย 45 คำ/นาที อังกฤษ 40 คำ/นาที
รถยนต์ ,
รถยนต์ ,
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
Thermal Conductivity Efficiency Improvement of Heat Sink by Nano Technology (Carbon Nanotube)