> Prepare drawing & calculation follow up Project spec for the customer.
> Recheck drawing & calculation.
> Repair drawing & calculation to analyze the problem of the comment review from customer.
> Following in planning to design & development master schedule.
> Knowledge systems ISO ,ASME ,API 650, Pressure Vessel, Heat exchanger design,
Stress analysis, Steel structure , Steam Boiler ,Hot Water Boiler ,Thermal Oil Heater ,Storage Tank Design & analysis.
>Estimate cost Pressure Vessel,Storage Tank
มกราคม 2553 ถึง พฤศจิกายน 2553
Piping Engineering
YTC Corporation Ltd.
24/1 Banlang Road T.Huaypong A.Muang Rayong 21150
สำหรับสมาชิกเท่านั้น
-Identify appropriate materials for the piping
system-pipe material grade , schedule,
corresponding fitting, etc
-Can produce estimate of specific piping
Work and produce material take-off
-Provide as-built measurement and other pertinent requirement of complete
Structure for final drawing.
- Must be willing to go on site surveys.
- Design as part of proposals to solve
Problems , develop work scope details,
Cost estimation , schedules , materials,etc
- Follow up in progress for work.
- Preparation for piping DWG (plot plan,
Piping plan General arrangement DWG
Etc.
-Model review and tag clear
-To review and ensure the quality of piping
product.
-Field engineering precommissioning & commissioning field Supervision,
Equipment inspection)
กันยายน 2549 ถึง ธันวาคม 2552
Maintenance
SUMMIT LAEMCHABANG AUTO SEATS MANUFACTURING CO., LTD.
-Support and maintain for process line, utility and facility system.
-Control, preventive and prepare the ratio of spare part and equipment.
-Control system of the machine for use in production to reduce in shot down time.
-Preventive maintenance to analyze the problem of the machine to refer in directly production process.
-Following in planning to PM.
-Study the step and the methods in work of reduce the working time and increasing the production.
-New machine and the other. To easy the follow up in process.
-Responsibility for utility and facility of plant.
-Communicate to Supplier.