1. Planning , Action and Follow up PM, CM and Overhaul Machine in Utility System Such as. Boiler system,
Chilled Water system, Air Compressor system, Air Condition system, Water treatment system
1.1 Boiler system @sat. 8 barg. ; Biomass Boiler 8 Ton/hr, C-oil Boiler 5 Ton/hr
1.2 Chilled Water system ; Screw VSD 700 USRT, Cooling Tower 1200 USRT,
1.3 Screw Air Compressor 10 nm3/hr @7 barg.
1.4 Water treatment system ; Filterate Water, Soft Water, RO Water, Waste Water Treatment.
2. Analyze and Make Report Machine Trouble for Machine Story
3. Analyze and Allocate Utility Consumption and Utility Cost
4. Project Control Installation Work New Machine in Utility system
5. Energy Saving Activity Project in Utility System.
6. ISO : 9001, 14001, 18001, 15001 , Safety Activity, 5S , GMP, HACCP
1. Planning PM & Overhaul Machine in Preparation Soybean Process - Planning PM & Overhaul Machine in Oil Extraction & Oil Refinery Process
2. Planning , Action and Follow up PM, CM and Overhaul Machine in Utility System Such as. Boiler system,Chilled Water system, Air Compressor system, Air Condition system, Water treatment system
1.1 Boiler system @sat. 8 barg. ; Biomass Boiler 20 Ton/hr,
1.2 Chilled Water system ; Screw VSD 300 USRT, Cooling Tower 600 USRT,
1.3 Screw Air Compressor 10 nm3/hr @7 barg.
1.4 Water treatment system ; Filterate Water, Soft Water, RO Water, Waste Water Treatment.
3. Analyze and Make Report Machine Trouble for Machine Story
1. Planning , Action and Follow up PM, CM and Overhaul Machine in Utility System .
1.1 Boiler System @sat. 16 barg. ; Coal Boiler 8 Ton/hr, LPG Boiler 10.5 Ton/hr and Diesel Boiler 4 Ton/hr
1.2 Chilled Water system ; Centrifugal 1100 USRT, Centrifugal VSD 700 USRT and Cooling Tower 1100 USRT
1.3 Air Compressor system ; Reciprocating 1,250 Nm3/hr @15 barg., Centrifugal Compressor 5,000 Nm3/hr @ 7 barg.
1.4 Air Condition System ; Air Washer , AHU, Air Package (1,045 kW Ref. 6 System)
1.5 Water treatment system ; Filterated Water, Soft Water
2. Analyze and Make Report Machine Trouble
3. Analyze and Allocate Utility Consumption and Utility Cost
4. Project Control Installation Work New Machine in Utility system
5. Energy Saving Activity Project in Utility System.
6. ISO : 9001 & 14001 , Safety Activity, 5S and Documents Control