Subsidiary in Thailand Empire Tower 3, 30th Floor 1 South Sathorn Road Yannawa / Sathorn Bangkok 10120 Thailand.
สำหรับสมาชิกเท่านั้น
1 Perform to review PTW and advise to Sub Contractor step by step
2 Perform to review recheck the completion of the Test package
3 Perform to checking and inspection and conformation to materials delivery to site works. Such as Cable drum and accessory etc.
4 Perform to review the Notice for FIN No.xxxxx before submit Client.
5 Perform to preparation of AFC drawing accordance with activities.
6 Perform to conduct team and supervise team of Sub Contractor as follows
6.1 Installation of Cable Support , Cable ladder accordance with AFC drawing including with internal inspection/Official Inspection.
6.2 Installation of Transformer 30M VA and 10MVA accordance with AFC drawing including with Vendors scope SAT
6.3 Installation of SWGR 115 kV and 6.6 kV and 400 V Panel SCHNEIDER product and accordance with AFC drawing including with Vendors Scope SAT.
6.4 Installation of MDB and MCC panel ABB product and accordance with AFC drawing including with Vendors Scope SAT.
6.5 Perform to preparation of GA (General Alignment) for reference any installation works.
6.6 HI-POT test Individual test MV Cable (22kV) and review and verify result after testing
6.7 Take care Vender s product and witness Individual test SWGR 115 kV and 22 kV , MDB 400 V , MCC (ABB and schneider, Akkarat Transformer.
6.8 Functional Testing and recording data test for finding test package
7 Report to E&I superintendent
1 Perform to take care and control PTW (Permit to works) all the Electrical activities in JBE Plant Rung-ta-wan Project.
2 Perform to review drawing & Verify AFC new revision before distribute to Sub Contractor
3 Perform to checking and inspection and conformation to materials delivery to site works.
4 Perform to do schedule planning and control progress and control refer to Project specification.
5 Perform to preparation of Drawing accordance with activities.
6 Perform to conduct and supervise of team Electrical Installation works
6.1 Supervise and conduct team for Installation of cable underground and accessories fitting
6.2 Supervise and conduct team for installation of Cable Tray and accessory
6.3 Supervise and conduct team for Installation of 8MVA Transformer incoming and 2500 kVA including with testing and Commissioning works
6.4 Supervise and conduct team for Installation of Fire alarm, Intercom, CCTV, Motor, Transformer, LCS, Pulling Cable
6.5 Supervise and conduct team for installation of Substation 22kV and 6.6kV SWGR, MCC, 400V MDB, UPS, CT, PT system installation.
6.6 Supervise for PI/IR Insulation & HIPOT test Individual test, Loop & Function test.
6.7 Review Documentation data test, Procedure, Specification of standard IEC, Procedure Method Statement
6.8 Perform to conduct and take care any Vendors to service do Testing & Commissioning
6.9 Perform to JSA SHE coordination
6.10 Perform vendor offer review & technical bid evaluation, carryout vendor drawings/documents review and vendor data incorporation.
6.11 Co-ordination with other disciplines. And including with take care Vendor during on Construction
6.12 Equipment sizing; UPS/ battery sizing; earthling lightning protection system calculations
6.13 Review to Job safety Analysis (JSA).
6.14 Monitoring Progress S Curve and Set & Appointment with Meeting with Client and Sub Contractor
7 Report to E&I Manager
1 Preparation and review of lay outs, single line diagrams, schematic diagrams. Reviewing drawing for AFC drawing and compared with site works or Weld-head platform
2 Loading Manpower as per project during on Site Weld-head Platform accordance with activities
3 Perform to checking sizing and selection of alternators, transformers, LV Switchgears, UPS, Navi Aids systems. Including with the cables (FS/ FRLS), lighting systems (indoor/ outdoor
4 Preparation of electrical equipment specification/ data sheets and power/ lighting/ earthling layouts. And data sheets for electrical equipment
5 Valuation selection of vendors for electrical equipment. Review/approval of vendor data into detailed design and test report
6 Co-ordination with other disciplines. And including with take care Vendor during on Offshore Weld-head Platform.
7 Conduct team of Installation of Electrical and Instrument on the Weld-head platform
8 Prepare, Review and approve instrument data sheets such as Control valve, On-Off Valves, Safety Relief Valves & other field instruments etc. Verify the calculations for the orifice plate bore, control valve CV, and PSVs, etc.
9 Prepare, Review & approve Cause & Effect diagram and Logic diagrams. Review and approve all the vendor documents for DCS/ ESD/BMS/PLC systems, Instruments and also for Package equipments
10 Responsible for electrical and Instrument engineering design, calculation and selectsequipment as project assigned
11 Approve Material and review shop drawing to ensure its conformation to design concept
12 Checks detail engineering drawings prepared by Drafters & Designers to ensure compliance to design codes/specifications.
13 Organize / Participate in project meeting with Licensor , contractor Engineers and other parties as project required/appropriate
14 Implement project documents and also distribute to related persons.
15 Conduct constructional works and checks
16 Witness fundamental testing and Run re-testing (if necessary)
17 Supervise and consult to sub-contract on site about the corrective installation methods.
18 Track the project work status and report to line manager periodically in order to ensure that every task is not overdue, reconcile in case of these any past-due job occur.
Names Company : Aditya Birla Chemicals (Thailand) Ltd
Position : Assistant Manager Electrical Division
Since : 01 August 2018 to Present.
Address Company : 3 Soi G-2, Prakornsongkrorad Road, Tumbol Hueypong, Amphur
Muangrayong, Rayong Province 21150
Scope of works : Shutdown Plant for Modification & Improvement Development
Principal Responsibilities
1. Responsibilities and in-charged with Electrical Maintenance and overall responsibility electrical department.
2. Hands-on experience on Power system protection, and relay co-ordination. Worked with High & medium voltage substations indoor / outdoor, High current power Rectifiers,well understood of Power electronics, Siemens PLCs, worked with Siemens / ABB numerical protection relays.
3. Improvement of UPS, Emergency DG Sets, HV, MV, LV Switch gears, MV / LV motors, VFDs, PA System, Plant illumination, Telephone Intercom systems
4. Planning, preparation & implementation of maintenance schedules for Shutdown Plant and preparation of Materials Specification
5. Identification of training needs and Skill development of the team. Implementation of PM plans. Planning annual shutdowns and executing in time frame. Preparation of technical data and technical evaluation of materials to be procured.
6. Guide the team with safe work practices and versed with ISO / OHSAS systems. I
7. Implementation of Energy management system and Energy conservation activities. Maintain electrical system and equipments in healthy condition to meet production targets. Find out the RCA and implementation of improvement points.
8. Proactively contribute to creating a good team atmosphere. Support and implement all management initiatives. Responsible for smooth functioning of the electrical department.
9. Support the department / unit in case of emergencies till it is put on normal function. Strong proficiency in Microsoft Office and worked in SAP. Maintaining good documentation, maintenance history.
Names Company : Vinythai Public Company Limited / Manpower THAILAND
Position : Electrical Inspector (Supervisor)
Since : 05 Mar 2018 to 30 June 2018
Address Company : No. 2, Map Ta Phut Industrial Estate
I-3 Road, Tambon Map Ta Phut Mueang Rayong,Rayong 21150
Tel: +66 (0) 38 925 000
Project : Shutdown Plant for Modification & Turn Around Revamp Project.
Contractor : ABB and SIEMENS.
________________________________________
Principal Responsibilities
As Project is shut down Plant for Modification and Turn Around Revamp. My activities highlight to Electrical Works and in-charged with Substation 115kV,22kV,6kV and 400V and Switch Yard Works and Transformer Power 115/22kV and Modification some of MCC 400V Module. And new SWGR 22kV installation including with Testing & Commissioning and functional testing
1 Perform to preparation of Drawing and Procedure Method Statement including with JLA
2 Permit to works In-Charge and Perform to do Installation of SWGR and Testing & Commissioning Works by SIEMENS
3 Perform to Witness for Protective Relaying Testing (Over Current Relay and Difference Relay and etc.
4 Perform to Witness for Transformer Power Testing and Commissioning by ABB
5 Perform to Witness for Electrical equipment in Switch Yard Testing.
6 Attends FAT for equipments and produces report on the findings, monitoring and witnessing pre-commissioning activities as well as the status of electrical commissioning activities.
7 Perform to Witness and reviewing to Commissioning plans and Commissioning procedures ensuring that all commissioning requirements.
8 Perform to Witness and reviewing to verifying Technical Drawings to Establish electrical commissioning scope of works.
9 Perform to Witness and reviewing for Preparation of commissioning.and Perform to Verify to Setting Data and Summary Progress and Report to Maintenance Manager.
10 Responsible to ensure that punch list has been closed out and relevant certification has been compiled before the commissioning process.
11 Checks system performance against criteria and ensures equipment are calibrated in accordance with the manufacturers instructions and recommendations.
12 Provides input for the preparation of test, safety and commissioning procedures, interacting with QA/QC team members and mobilises vendors for equipment testing and commissioning at project site.
13 Responsible for Documenting commissioning progress, site reports, ensuring that sign off have been completed with the relevant stakeholders and reviews the compilation of final commissioning dossiers
14 Report to Maintenance manager (Vinythai)
ประวัติการฝึกอบรม
มิถุนายน 2539 ถึง มิถุนายน 2539
Department of Labor Protection and Welfare Chonburi
safety in the work Welfare office and protect the labor , Chonburi
สิงหาคม 2543 ถึง สิงหาคม 2541
Ministry of Science, Technology and Environment
Energy Development and support Department
เมษายน 2547 ถึง เมษายน 2547
Ministry of Manpower Accredited Training Provider Singapore
Safety Orientation Course for Workers (Oil/Petrochemical)
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (ดี) อ่าน (ดีมาก) เขียน (ดีมาก)
ไทย 20 คำ/นาที อังกฤษ 20 คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,รถจักรยานยนต์ ,
Names Company : ABB PTE. LTD. (SINGAPORE)
Positon : ELECTRICAL COMMISSIONING ENGINEER
Since : JULY6, 2008 to APRIL 30 2010
Project : SINGAPORE PARALLEL TRAIN PROJECT, JURONG ISLAND
Main Contractor : FOSTER WHEELER IN SINGAPORE
Client : EXXONMOBIL SINGAPORE
Project : MODIFICATIONS PROJECT IN SINGAPORE
Main Contractor : FOSTER WHEELER IN SINGAPORE
Client : SHELL BUKOM REFINERY PLANT
Address : 2 Ayer Rajah Crescent, Singapore 139935
Responsibilities :
1 Preparation of Drawing and Single line Diagram accordance with Panel Local to BRM Project
2 Preparation of specification and standard accordance BRM Project
3 Preparation check sheet or test form accordance with BRM Project
4 Planning and making schedule Test &Commissioning works and submit to FOSTER WHEELER for approve.
5 Preparation of tester all the test equipment related with our scope of works
6 Testing & Commissioning for Transformer 150 MVA 33/11 kV and Switchgear and GIS FS6 insulation testing. And Testing of CT, P.T., CVT, Circuit breaker, switch gear and Power Transformer
7 AC High voltage test: 11KV Bus bar and DC High voltage test: 11KV Cables
8 Transformer and motor protection at Az-zour power station 11KV switchgear
9 Inspection of all electrical work and operations with respect to international electrical norms and Niger electrical code(NEC
10 Preparation Drawing and Single line Diagram accordance with Panel Local to SP T Project
11 Operation Test Equipment such TR800 for Ratio testing Transformer, Faja 300 Programma for Protective Relay and CT Analyze
12 Perform to created JSA and Procedure Mothed statement
13 Carry out inspection and test for various electrical equipment such as transformers, circuit breakers, HV/LV switchgears and other electrical equipment in the presence of the clients.
14 Prepare planned and unplanned switching steps. Isolate equipments for working personnel.
15 Analyse system failures, relay targets and alarms of equipment tripping and take necessary action to restore the power and plan to prevent the re-occurrence. Notify the management and prepare the interruption report.
16 Monitors and controls the operation of AL JOUF power systems via SCADA (Foxboro Work Station Computer) whether during normal or abnormal operating conditions.
17 Coordinates on a real time basis, with the power generation group to meet the daily forecasts demands, directs the running hours of the On-Line generating units to ensure that electricity is produced as economically as possible to meet systems demand requirement with the required spinning reserve.
18 Part of the pioneering team that conceptualized and constructed the companys two 25 MVA 69 / 13.8 kV, 60 Hz. substations. Subsequently became a part of the group that operated and maintained the said substation
19 Report to Commissioning Manager
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
SYARIKAT KEJURUTERAAN SISTEMATIK SDN BHD in Brunei
Positon : ELECTRICAL COMMISSIONING ENGINEER
Since : MAY 18, 2010 UNTIL SEPTEMBER 30, 2011
Project : SCOT PHASE 2 EWTP PROJECT
BRUNEI.METHANOL COMPANY SENDIRAN BERHAD (BMC)
Client : BRUNEI SHELL PETROLEUM COMPANY SENDIRIAN BERHAD (BSP)
Address : Seria Lot 49-51, Sg. Bera Light Industrial Area Seria, KB1933, Negara Brunei Darussalam
Tel: (673) 3223 863
Responsibilities : In Brunei
1 Liaise with other departments, clients, vendors, subcontractors and third parties as required by the project
2 Participate in inter-disciplines, project, and client and vendor meetings
3 Perform to preparation of electrical system Drawing for 66 kV AIS/ GIS Sub-station; HV & LV power generation and distribution system; lighting and small power system; earthling and lightning protection system; power management and load shedding systems; marine navigation aid system; electric heat tracing system; catholic protection system. (AFC) layouts, cable schedule and installation details. And Prepare equipment data sheets, specifications & requisition
4 Perform vendor offer review & technical bid evaluation, carryout vendor drawings/documents review and vendor data incorporation
5 Commissioning Works
5.1 Carry out inspection and test for various electrical equipment such as transformers, circuit breakers, HV/LV switchgears and other electrical equipments in the presence of the clients.
5.2 Verify and witness T&C of all electrical equipment such as HV/MV and LV switchgears, AC/DC UPS panels, Battery banks, electrical control system and Integrated protection and control system (ECS and IPCS)
5.3 Set up, operate test equipment to evaluate the performance of electrical components, assemblies or systems under simulated operating condition and record the results.
5.4 Analyze and Interpret test report to determine any acceptable and unacceptable results and design related problems.
5.5 Provide technical assistance and resolution when electrical and/or engineering problems are encountered during testing and commissioning.
5.6 Collaborate with other Electrical Engineers of the client and other key personnel to identify and solve the problems
5.7 Conduct periodic site inspection for QA and QC programs. Report the findings and recommendations.
5.8 Adhere to safety rules and regulations of the company to avoid accident at worksite. Conduct tool box meeting every start of the work to caution the workforce of all the potential danger in the worksite.