'I support and service costomer Nissan,Toyota motor,Faurecia,Casonic kansei,Kawasaki
> Write Control plan,working standard,Inspection standard,Q-Point, etc.
> Audit in process by refer control plan and supplier manual
> Audit in process of supplier by refer control plan and supplier manual of my
> Answer Feed back and Encr of customer
> Write 8D Report,Analysis of problem by 4M,Fish bone,5 Why Analysis,3Gen,Patrol
> control part at Dock Audit before delivery to customer by refer working standard
> Agent of section qa Audit system ISO/TS 16949:2002 and Internal audit
Documentation will be include.
- Description of the issue / nonconformance.
- Definition / root cause
- Interim action and effective date.
- Performance action and effective date.
- Verification
- Control Plan
- Prevention
- 8D Report
- 4 M
- 5 Why
- 4 M Service
- QA - Matrix
- APQP
- PPAP
- FMEA
สิงหาคม 2553 ถึง พฤษภาคม 2555
Quality Assurance Engineer
New somthai Mortor work Co., Ltd.
73/1 ( Bangna-Trad Road, KM 13.5 Samutprakarn ) 10540
สำหรับสมาชิกเท่านั้น
A writen corrective and preventive action for summit to the customer.
Documentation will be include.
I support and service costomer as Izusu motor,Izusu engine,BOSCH,Kawasaki,MTAT
,Koyo joint,Yamaha,KLK,Takei,Honda,Daikin,Yamada Somboon
Write Control plan,working standard,Inspection standard,Q-Point, etc.
Audit in process by refer control plan and supplier manual
Audit in process of supplier by refer control plan and supplier manual of my
Answer Feed back and Encr of customer
Write 8D Report,Analysis of problem by 4M,Fish bone,5 Why Analysis,3Gen,Patrol
Try Part new project with customer and Engineering team.
control part at Dock Audit before delivery to customer by refer working standard
and requirement of customer
Agent of section qa Audit system ISO/TS 16949:2002 and Internal audit with
External Audit
A writen corrective and preventive action for summit to the customer.
Documentation will be include.
- Description of the issue / nonconformance.
- Definition / root cause
- Interim action and effective date.
- Performance action and effective date.
- Description of the issue / nonconformance.
- APQP
- PPAP
- FMEA
- Verification
- Control Plan
- Prevention
- 8D Report
- 4 M
- 5 Why
- 4 M Service
- QA - Matrix
สิงหาคม 2548 ถึง พฤษภาคม 2553
Quality Assurance Engineer
Thongchai Industrial Co., Ltd. ð Thaira Group.
12/4 M.6 (Bangna-Trad Road, Samutprakarn) 10540
สำหรับสมาชิกเท่านั้น
I support and service costomer as Izusu motor,Izusu engine,GM,Kawasaki,usui,jtekt,
Thai summit,yamaha,Honda,Mahle Siam
Write Control plan,working standard,Inspection standard,Q-Point, etc.
Audit in process by refer control plan and supplier manual
Audit in process of supplier by refer control plan and supplier manual of my
Answer Feed back and Encr of customer
Write 8D Report,Analysis of problem by 4M,Fish bone,5 Why Analysis,3Gen,Patrol
Try Part new project with customer and Engineering team.
control part at Dock Audit before delivery to customer by refer working standard
and requirement of customer
Agent of section qa Audit system ISO/TS 16949:2002 and Internal audit with
External Audit
A writen corrective and preventive action for summit to the customer.
Documentation will be include.
- Description of the issue / nonconformance.
- Definition / root cause
- Interim action and effective date.
- Performance action and effective date.
- Verification
- Control Plan
- Prevention
- 8D Report
- 4 M
- 5 Why Analysis
- Fish bone
- 3 Gen
- Answer Feed Back And ENCR
- Working Standard,Q-Point
- Inspection Standard
- Analysis of problem
Establish the procedure, work instruction and inspection standard etc.
Provide training plan for inspector by considering job description
Monitor and control the plan to ensure the meet training schedule
Coordinate to concern section (Engineering, Production, Planing, etc.)