Issue proposal to client for bidding
Monitoring and review condition for contract
Attend project meeting
Review cost plan
Monitoring construction schedule
Review cost report
Attend negotiate meeting
Review and recommend VO work
Advice award strategic to client
-Manage and coordinate contractor, subcontractor, designer, consultant and supplier
-Monitoring and control budget for project
-Control direct cost from direct labor
-Monitoring and control master schedule and key milestone
-Find solution when contractor get the problem
-Negotiate all variation order from contractor
-Recheck payment from contractor
-Random inspection quality on site
-Inspection mockup room
-Recheck additional cost from contractor
-Recheck and monitor document control for project
-Manage and coordinate direct purchase package
-Clarify design defect (some design it not functional)
-Lead site meeting with consultant, designer and contractor
-Reporting progress to MD every week and make monthly presentation to CEO
-Coordinate with Customer transfer team
-Follow up and closed defect list from customer and juristic
-Manage after sale service team (In term of warrantee period)
- Re testing and commissioning every system before transfer to Juristic
-Manage labor and material budget for rectify defect team
-Coordinate with sale team for arrange event
-Add more function for end user (without design)
Pre Construction
-Arrange consultant and designer to join the project
-Coordinate design between hotel operator and designer
-Manage all structure design and coordinate with pre cast factory
-Monitor budget between design develop
-Control GFA between design develop
-Recheck hotel standard design with designer
-Monitor and control tender process
-Monitor and follow up design period with master schedule
-Review tender document before issue to contractor
During Construction
-Recheck site progress before certify contractor payments
-Join inspection sand reclamation and rock protection work
-Update progress and make report to management
-Monitor site meeting in Thailand and Maldives
-Negotiate variation order with contractor
-Control time for deliver precast concrete from Thailand to Maldives
-Recheck material damage on site
2011 2016
Magnolia Finest Corporation Limited (AVP construction)
Responsibilities
Pre Construction
- Arrange consultant and designer to join the project
-Control time line for design and submission follow master schedule
-Control budget between design develop
-Manage and coordinate permit submission (BMA) process
-Lead design develop meeting
-Arrange direct purchase package tendering
-Arrange all tender package
-Set up strategy tender package sequence
-Set up details for master schedule
-Solve the big problem for project (Main contractor busy to join tender reason from flood problem, demolition period as follow structure design it over schedule)
-Set up process for direct construction material
-Review contract before award
-Set up sale gallery (Condo) and mock up room for hotel
During Construction
-Manage and coordinate contractor, subcontractor, designer, consultant and supplier
-Monitoring and control budget for project
-Monitoring and control master schedule and key milestone
-Find solution when contractor get the problem
-Negotiate all variation order from contractor
-Recheck payment from contractor
-Random inspection quality on site
-Inspection mockup room and sale gallery (Condo)
-Recheck additional cost from contractor
-Recheck and monitor document control for project
-Manage and coordinate direct purchase package
-Lead site meeting with consultant, designer and contractor
-Make monthly report progress to MD
-Certify payment for designer and consultant
Post Construction
-Coordinate with Customer transfer team
-Monitor and closed defect list from customer
-Recheck certificate for final of completion with QS
-Balance variation order with contractor
-Revise interior design some corridor as follow owner requirement
2010-2011
Meinhardt (Thailand) Ltd.
Project Manager
Ducati Factory: Motorcycle factory at Amata City Rayong
Almenda Factory: Sweetener Factory at Amata City Rayong
Aloft Hotel: Hotel Inter chain at Phuket
Responsibilities
Pre-Construction
- Design Management for Schematic design, Design concept and Design Develop with all designer
- Manage Cost control for project including VE for project
- Manage Master schedule and monitoring (Planning Master schedule)
- Manage authority issue (EIA, IEAT, Construction permit)
- Issue minute of design meeting
- Review and monitor pre-qualification process (Before issue invitation contractor for Bidding)
- Manage Tender Document and arrange bidding
- Review and monitor comparison process between award process
During-Construction
- Review method statement from contractor
- Review design form contractor (Design and Built contract)
- Chase schedule and find solution to contractor for correct problem
- Minimize and negotiate variation order from contractor
- Review and monitoring QA and QC
- Issue weekly report
- Coordinate and review method statement for equipment installation from owner
2008 2010
Winpro Engineer Co., Ltd
Project Manager
Phu Mundra The Condo at Phuket : Low rise condominium 130 Rooms in 15 buildings
Area around 8 Rai
Responsibilities:
Pre-Construction
- Provided document support for Pre-Qualify paper for designer before award them for design concept of project
- Provided approval paper for decision to top management for award designer.
- Coordinate and review design (architect, structure, M&E, infrastructure, landscape and interior) before issue tender to contractor.
- Selected consultant for each project to management approval for process tender document and help our company keep record, control cost report, monitor VO etc. (For all document will be control and review by us and report to management)
- After finished design development stage I will provide document paper for Pre-Qualify contractor
2005-2008
TCC Property Development Company Limited / TCC Capital Land Company Limited
Assistant Project Manager
Banyan Tree Samui : 5 stars resort at Samui, Operator by Banyan tree
88 villas on area 5 rais for new resort
Imm Hotel Chiang Mai : 3 stars hotel at Chiang Mai, Operator by TCCHG
106 rooms 4 stories for renovation
Le Meridian Chiang Mai : 5 stars hotel at Chiang Mai, Operator by Starwood
391 rooms 22 stories and 3 stories for retails shop
The Royal Residence : Housing project
Responsibilities:
Pre-Construction
- Provided document support for Pre-Qualify paper for designer before award them for design concept of project
- Provided approval paper for decision to top management for award designer.
- Coordinate and review design (architect, structure, M&E, infrastructure, landscape and interior) before issue tender to contractor.
- Selected consultant for each project to management approval for process tender document and help our company keep record, control cost report, monitor VO etc. (For all document will be control and review by us and report to management)
- After finished design development stage I will provide document paper for Pre-Qualify contractor
- Review tender document (contract, drawing, specification, BQO item) before bidding.
- After tenderer submitted tender and consultant finish comparison report. Im review and issue approval paper to Management before award contractor.
- Coordinate Bangkok Metropolitan Authority (BMA) about authority submission for issue construction permit and land submission.
- Coordinate district and land department
During- Construction
- Assist project management for monitor Time, Cost and Quality of project
- Assist project management for strategy planning in construction (Master schedule and mile stone of project)
- Chasing progress of work to contractor, review, negotiate and issue Architect Instruction, Employee Instruction and Variation Order to contractor.
- Issue Purchase Order and Work Order to supplier (procurement work) and set up meeting for brain storm strategy for Value Engineer of project.
- Review and certify payment claim from contractor.
- Review, approved RFA and RFI to contractor and coordinate with designer for reply document to contractor.
- Leader meeting for monitor contractor progresses, minimize all risks for catch up before project delay.
- Process ISO procedure according company policy.
- Update weekly and monthly report (Cost control) to top management.
- Coordinate Metropolitan Electrical Authority (Infrastructure work) and Metropolitan Water Authority (Water supply work)
- Assist project management for monitor and manage structure, architect, interior, infrastructure, M&E, landscape and hardscape contractor.
- Coordinate with interior designer for procurement props work for project.
- Negotiate Variation Order with contractor and supplier.
- Support other department for adjust design according all comment from customer, management and geomancer
2000-2004
Bovis Lend Lease (Thailand) Ltd.
Site Engineer
Holiday Inn (Renovation work), Metropolitan Hotel (Renovation work),
Tri-Sara Resort
Responsibilities:
During-Construction
- Planning renovate schedule for transfer loose furniture and old finishing for take out and sale out to costumer.
- Coordinate buyer for manage root line of moving loose furniture.
- Planning and Controlled demolish work
- After demolish work Im monitor and controlled Time, Cost, Quality and safety for some area according site manager assign (External work, structure work, kitchen equipment work).
- Arrange bidding contract to contractor according scope of work.
Structure Work Details
- Monitor, planning, controlled and certify payment claim for Micro pipe work for augment strength to floor structure.
- Monitor, planning, controlled and certify payment claim for Steel structure work for revised function of new hotel design
- Monitor, planning, controlled and certify payment claim for concrete structure work for support new function design
- Monitor, planning, controlled and certify payment claim for repairing structure for modify and additional strength to new structure.
Kitchen Equipment Work Details
- Coordinate design (Kitchen designer) and monitor progress of work to contractor
- Planning work schedule for procurement all kitchen equipment
- Evaluate Variation Order from original design
- Certify progress claim to contractor
- Inspection quality after installation and test run
- Negotiate Variation Order after issue Site Instruction to contractor
- Checking quality of material according specification