- Plan and control preventive maintenance for building system such as electric system (MDB), air conditioning
system(chiller), water system (heat pump), treatment system (water softener)
- Plan energy conservation for building
- Control fire protection system including fire pump, fire alarm system, Jockey pump
- Prepare monthly report about electric system, water treatment system and send to related government office
- Plan and control preventive maintenance for building system such as electric system (MDB), air conditioning
system(chiller), water system (heat pump), treatment system (water softener)
- Plan energy conservation for building
- Control fire protection system including fire pump, fire alarm system, Jockey pump
- Prepare monthly report about electric system, water treatment system and send to related government office
• Development of a stand-alone thermoelectric power generator using heat of refrigerant leaving the condenser and self-cooled by condensate of a split-type air conditioning
• Development of Solar Water Heater with PCM Absorber
• Design and build model Cooling system Pressure Management To save energy (5 Plus)