CURRICULUM VITAE
MR.VATCHARA KIRDKONG
P a g e 1 | 9
Present Address : 192/36 M.11 T.Nongkham Sriracha Chonburi 20110
Tel. 087-1404839
Date of Birth : March 9, 1967
Place of Birth : Trang Province
Nationality : Thai
Religion : Buddhism
Height Weight : 170 Cms./70Kgs.
Health : Excellent
Marial Status : Single
Speciation Abilities : Communication in Written and Speaking Both Thai and English Languages
Education : Phuket Technical College (Phuket Province)
1990-1991 : Diploma
Work Experiences
Aug 22 – Present : Uni thai Shipyard and Engineering Co., Ltd.
Project : F/T & V/T FIRE WATER T-3078 PROJECT (SD’22)
Client : Thai Oil Public Company Limited
Position : QC Inspector
Responsibilities : Inspect Structural assembly work before delivery and coordinate with
Responsible departments.
2022 – May 22 : J.S.J.Engineering Company Limited.
Project : Prink Line Project (Nonburi-Khae Rai)
Client : Sino-Thai Engineering & Construction Public Co.,Ltd. / MRT
Position : QC/Inspector
Responsibilities : - Measure the width and length of walkway.s cable tray, left and right,
And handrail
- Hand over the work to the main company, owner, including the company
that set up the system.CURRICULUM VITAE
MR.VATCHARA KIRDKONG
P a g e 2 | 9
2018 – 2020 : Sino-Thai Engineering & Construction Public Co.,Ltd.
Project : Structural work of the Blue train and the National Assembly
Client : Sino-Thai Engineering & Construction Public Co.,Ltd.
Position : QA/QC Inspector / Forman
Responsibilities : Inspect Structural assembly work before delivery and coordinate with
Responsible departments.
2016 – 2017 : Sino-Thai Engineering & Construction Public Co.,Ltd.
Project : MRT Blue Line Project
Site Position : QA/QC / Forman
Owner : MRT
Main Contractor : PCBL
Responsibilities : Control, Installation, Roof, Walkway, Entrance Station.
2013 – 2015 : Sino-Thai Engineering & Construction Public Co.,Ltd.
Project : MRT Purple Line
Client : Sino-Thai Engineering & Construction Public Co.,Ltd.
Position : QA/QC Inspector / Forman
Responsibilities : Control, Installation, Roof, Walkway, Entrance Station.
: Sino-Thai Engineering & Construction Publie Co.Ltd
Dec’2011 – 2012Project: Gulf Sriracha Power Plant
: Parliament in Bangkok
Site Position : QA/QC
Owner : Gulf MP Company Limited
: Government Department
Main Contractor : Toyo – Thai Cornoration Public Company Limited.
: Sino-Thai Engineering & Construction Public Co.,Ltd.
Responsibilities : Inspector all assembly work.
: Sion-Tnai Enginecring &Constrvction Pubile.Co.Ltd.CURRICULUM VITAE
MR.VATCHARA KIRDKONG
P a g e 3 | 9
2010 – 2011 Project : Thai Growth Project (Power, Utilities and Infrastructure Project)
Site Position : QA/QC Inspector
Owner : Dow Chemical Co.,Ltd.
Main Contractor : Foster Wheeler International Corporation.
Responsibilities : Inspect Welding work, pipe work, and Supervisor related teams.
: Preparation welder Qualification test record.
2008 – 2009 : Sino-Thai Engineering & Construction Public Co.,Ltd.
Project : Pluto LNG Project (Sriracha work shop)
Owner : Woodside Burrup PTY Ltd.
Main Contractor : Foster Wheeler International Corporation.
Position : CWI Supervisor
: QA/QC welding
Responsibilities : Inspect Welding work, pipe work, and supervisor related teams.
: Post-Test Reinstatement Check
: Inspection Paint and report of Control
: Control NDT system
: General control with customer
1 Apr 06 – 31 May 08 : Sino-Thai Engineering & Construction Public Co.,Ltd.
Project : South Bangkok Combine Cycle Power Plant Block III
Client : Mitsubishi Corporation (Sino-Thai Engineering & Construction
Public Co.,Ltd.)
Position : QA/QC Supervisor
Responsibilities : Preparation Quality Plant / ITP Plan for Piping Work and Structure
Steel Works.
: Preparation Welder Qualification Test Record.
: Preparation Welding Procedure Specification.
: Post-Test Reinstatement checkCURRICULUM VITAE
MR.VATCHARA KIRDKONG
P a g e 4 | 9
: Preparation Painting Inspection check as Control
: Preparation Test Package Steel Structure and Piping System Control
: Preparation stem Blow Boiler System
: Field Quality Control and Handover Document
: Preparation Hydro test and Peneumatie test Procedure system
11 Aug 05 – 31 Mar 06 : Sino-Thai Engineering & Construction Public Co.,Ltd.
Project : Indorama PTA Project
Client : Foster Wheeler International Corporation.
Position : QA/QC Supervisor
Responsibilities : Field Quality Control and Handover Document
: Preparation Test Package System
05 Jan 05 – 10 Aug 05 : Sino-Thai Engineering & Construction Public Co.,Ltd.
Project : Coco Generation Power Phase IV Stage 2
Client : Marubeni Corporation Plan Co.,Ltd.
Position : QA/QC Supervisor
Responsibilities : Field Quality Control and Handover Document
: Preparation Welding Procedure Specification.
: Preparation Welder Qualification Test Record.
: Preparation Test Package Steel Structure and Piping System Control
: Preparation stem Blow Boiler System
: Post-Test Reinstatement check
: Preparation Painting Inspection check as Control
02 Feb 03 – 20 Dec 04 : Sino-Thai Engineering & Construction Public Co.,Ltd.
Project : Coco Generation Power Phase IV Stage 1
Client : Marubeni Corporation Public Co.,Ltd.
Position : QA/QC Supervisor
Responsibilities : Field Quality Control and Handover DocumentCURRICULUM VITAE
MR.VATCHARA KIRDKONG
P a g e 5 | 9
: Preparation Welding Procedure Specification.
: Preparation Welder Qualification Test Record.
: Preparation Test Package Steel Structure and Piping System of
Equipment Control Test Package.
: Preparation stam Blow Boiler System
: Preparation Painting Inspection check as Control
: Post-Test Reinstatement check
: Handover Test Package System
18 May 02 – 1 Feb 03 : Sino-Thai Engineering & Construction Public Co.,Ltd.
Project : G1 Project
Client : JGC Corporation Public Co.,Ltd.
Position : QA/QC Supervisor
Responsibilities : Field Quality Control and Handover Document
: Preparation Welding Procedure Specification.
: Preparation Welder Qualification Test Record.
: Preparation Test Package Steel Structure and Piping System of
Hydrostatic-Test Control
: Post-Test Reinstatement check
: Inspection Painting and Report of Control
2 Jan 02 – 7 Apr 02 : Sino-Thai Engineering & Construction Public Co.,Ltd.
Project : Ohanet Project
Client : ABB, Lummus Global B.V
Position : QA/QC Supervisor
Responsibilities : Fabrication Piping Workshop control Inspection
: Preparation Welding Procedure Specification.
: Preparation Welder Qualification Test Record.
: Preparation Painting Inspection check as ControlCURRICULUM VITAE
MR.VATCHARA KIRDKONG
P a g e 6 | 9
: Dimension check Piping Inspection as Control
1 May 01 – 1 Jan 02 : Sino-Thai Engineering & Construction Public Co.,Ltd.
Project : Lyondell Chemical (PO11) Project
Client : ABB, Lummus Global B.V
Position : QA/QC Supervisor
Responsibilities : Fabrication Piping Workshop Inspection Check of control
: Preparation Welding Procedure Specification.
: Preparation Welder Qualification Test Record.
: Dimension check Piping Inspection as Control
: Preparation Painting Inspection check as Control
15 Jan 00 – 30 Apr 01 : Sino-Thai Engineering & Construction Public Co.,Ltd.
Project : The Installation of Trunk main and Related Works
Client : Metropolitan Waterworks Authority Bangkok Thailand (MWA)
Position : QA/QC Supervisor
: Preparation Welding Procedure Specification.
: Preparation Welder Qualification Test Record.
: Control Radiographic Test (RT) Report
: Control Holiday Test
: Preparation Hydrostatic Test As Pertest Package
: Field Control Check Painting
1 Jan 99 – 14 Jan 00 : Sino-Thai Engineering & Construction Public Co.,Ltd.
Project : IPT Stage 1 – 700 MW IPP. CCPP.
2x : MW Combustion Turbines
1x : MW Steam Turbine (2 x HRSG)
Client : Sement Westing House co.,Ltd.
Position : QA/QC Supervisor
Responsibilities : Field Quality Control and Handover DocumentCURRICULUM VITAE
MR.VATCHARA KIRDKONG
P a g e 7 | 9
: Preparation Welding Procedure Specification.
: Preparation Performance Qualification Test Records
: Preparation Hydrostatic Test as Pertest Package
: Filed Quality Control Welders
23 Jan 98 – 31 Dec 98 : Sino-Thai Engineering & Construction Public Co.,Ltd.
Project : Thai Oil Hydrodesulphurisation (HDS) Project
Client : Chiyoda Thailand Co.,Ltd.
Position : QA/QC Supervisor
Responsibilities : Field Quality Control and Handover Document
: Preparation Welding Procedure Qualification Records Test
: Preparation Performance Qualification Test
16 Jan 97 – 22 Jan 98 : Sino-Thai Engineering & Construction Public Co.,Ltd.
Project : NSM Flat Rolled Product Facility
Client : Nakhonthai Strip Mill Co.,Ltd. Bovin/ Chonburi
Position : QA/QC Supervisor
Responsibilities : Installed Conveyer Steel Inspection
: Installed Constell Connexting Car Inspection
: Installed Furnace Inspection
: Installed Upper Shall Inspection
: Installed Leder Car Inspection
: Installed Lower Shall Inspection
14 Aug 95 – 15 Jan 97 : Sino-Thai Engineering & Construction Public Co.,Ltd.
Project : Hydrocracker (HCU-2) Project
Client : Chiyoda Thailand Co.,Ltd.
Position : Foreman Welders as Control
Responsibilities : Liquid Penetrant as Control
: Magmatic Partic Holiday Test as ControlCURRICULUM VITAE
MR.VATCHARA KIRDKONG
P a g e 8 | 9
: Preparation Welding Procedure Qualification Test
: Preparation Performance Qualification Test
23 Dec 94 – 13 Aug 95 : Sino-Thai Engineering & Construction Public Co.,Ltd.
Project : Kiln 6-Cement Expansion Project
Client : Siam City Cement Public Co.,Ltd. Saraburi
Position : Assistance Foreman
Responsibilities : Installed Cement Cooler Inspection
: Installed Belt Conveyer Inspection
: Installed Speratior Installation
: Installed Screw Conveyer Inspection
10 Oct 94 – 22 Dec 94 : Sino-Thai Engineering & Construction Public Co.,Ltd.
Project : Thai Oil Hydrocracker Revamp
Client : Foster Wheeler International Corporation
Position : QA/QC Piping Inspector
Responsibilities : Field Installation Inspection
: Pressure Testing Inspection
- Test Package Preparation, Mechanical Installation and P & ID Check,
Pre-Test Punch
: Field Cleaning of Piping
: Post – Test Reinstatement Check
30 Oct 93 – 9 Oct 94 : Sino-Thai Engineering & Construction Public Co.,Ltd.
Project : Esso Standaed Sriracha Refinery (Expansion Project APS-2 & FCCU)
Client : Foster Wheeler International Corporation
Position : QC Technicain
Responsibilities : Check Fabrication Pipe Spools as per Drawings and Specificaitons
: Piping Layout Isometric work and Piping Material Take off Form
Isometric DrawingCURRICULUM VITAE
MR.VATCHARA KIRDKONG
P a g e 9 | 9
: Performs Line Checking/Punch listing of Test Package
: Prepare Hydrostatic Test and Per Test Package
: Control and Files Material Tractability Records
24 Apr 91 – 23 Mar 92 : Sino-Thai Engineering & Construction Public Co.,Ltd.
Project : Thai Oil Refinery Project Expansion Stage II
Client : Chiyoda Thailand Co.,Ltd.
Position : QC Technician
Responsibilities : Prepared Detail of Procedures
: Prepared and Record Keeping for the Calibration of Instrument
: Solve Problem in work
: General Control with Customer