Control Fabrication & Packing Delivery to Side. Check, control and record the fabrication drawing. Control and inspect the fabrication to be correct according to the drawings. Packing the workpiece delivery to side.
Site work. Prepare and control package team work : Prepare packages record and control, progress of package issued for construction team. Control package punch team and close the clear punch list for construction stage.
ไม่ได้ระบุ
Structural Design Engineer Site and Shop fabrication work.
Shop fabrication and Site construction work : Assembly modularization. ,Control fabrication team. ,Lifting Plan of equipment for modularization. Prepare lifting plan layout drawing for lifting team control.
Company : Puritek Engineering Co.,Ltd
Period : 2010 to 2013
Position : Project Control engineer
Work Description : Contacting customers, looking at the job site, appraising prices, planning work, design and Shop drawings, ordering materials, controlling production and controlling the installation of machines..
ประวัติการฝึกอบรม
มีนาคม 2554 ถึง มีนาคม 2554
บริษัท เทคโนโรยีไออาร์พีซี จำกัด
เจ้าหน้าที่ความปลอดภัยในการทำงาน ระดับหัวหน้างาน
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (ดี) อ่าน (ดี) เขียน (ดีมาก)
ไทย คำ/นาที อังกฤษ คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,รถจักรยานยนต์ ,
Computer : MS Office (Word, Excel, Power point, Outlook, etc.), In-house software (TCMS, LMS, SMS, Mango, FMCS(Samsung in-house)), Adobe PDF, Adobe Acrobat XI, 3D modelling (Navis work, Smart Plant, Sketch up, Tekla Structures), Pipe data Pro, Pipe Support Pro, AutoCAD, SolidShape.
Performance : SECL Secondary Support (OC3) - TOPSMP
: [TOPCPF] Priority Secondary Support CV-005
: Secondary support for vessel clip_C-10101,C-10201
: OC3 Secondary support for C-10101,C-10302