Upload and Update Drawing to department
database
Request Inspection NDE
Update the accepted complete report NDE
to the database
Monitor status of each spool and joint
Update Heat No , Fit up Inspection Date.
Visual Inspection Date, and Final Inspection
Date
Control Material Receiving Report (MRR) all
discipline
Control Test Packages
Control Request for Inspection (RFI)
Input Status for Pressure Test. Flushing, and
Reinstatement package
MDR ( Manual Data Report) management