- Purchase requisition Receive and Inspection material
- Preventive maintenance every machine in work shop and other plant
- Make and repair every part machine before breakdown
- Plan schedule for next shutdown
- Dimension check , Hardness ,PT/MT,UT,RT for run process
- Select welding process and consumable
- Machine design for CNC machine
- Installation , Fabrication , machining spare part for equipment
- Training welder and Welder Qualification test
กันยายน 2561 ถึง พฤษภาคม 2562
QC&QA Engineer
Vatana Phaisal Engineering Co.,Ltd,
1/7 Moo 5 Kokthai,Srimahosod,Prachinburi 25190
สำหรับสมาชิกเท่านั้น
Project Name :P66 Midstream Phase 2 Project (Hot Oil Heaters SWY-7700-GRP-36-001)
Client
Petro Chemical Development / 66 Phillips
- Responsible for management overall quality control Project Quality .
- Prepare Procedure & ITP submit for Approved for Inspection/acceptance.
- Inspection material , Review certificate and material receive inspection report (MRI).
- Update & Check drawing and prepare set point of pressure test.
- Control NDE follow line list for Inspection test plane (ITP).
- Welder Qualification Test (WQT) follow welding procedure specification (WPS).
- Refractory testing for personal and demonstrate.
- Supervising filler metal and electrode follow material procedure and review certificate.
- Inspection NDE of Fabrication in workshop control Progress and Performance of quality work flow.
- Inspection Structure ,Refractory and piping process.
- Monitoring welding process in accordance with approved (WPS) Progress and daily report.
- Notification to client and Inspector for witness every method follow ITP.
- Check welding history sheet hydro test.
- Check and clear punch list.
- Sand bushing/Check profile surface before Primer intermediate and top coat , check surface thickness.
- Soundness test with anchore ,monitoring refractory, lab test, hammer test before / after dry.
- Final Inspection with client and inspector before packing & shipping follow shipping procedure.
- Control Test package Commissioning Document handover to Owner.
- Review MDR before handover the final document to client.