- Develop customer relation
- Increase sale and market share by approach new customers, do market research and study competitors
- Investigate market price and review current cost
- Improve operation by focus on lead time and inventory reduction
ตุลาคม 2556 ถึง กันยายน 2559
Lean Specialist
HEIL TRAILER ASIA, LIMITED.
168 Moo16 Bang Pain Industrial Estate, Udomsorrayut Road, Tambol Bang Krasan, Amphoe Bang Pain, Phra Nakhon Si Ayutthaya , 13160
สำหรับสมาชิกเท่านั้น
- Lean manufacturing implementation
- Implement single piece flow production line, develop PULL system, work balancing and takt time control.
- Time study, create Standardized Works, improve processes, work flow and layout, also do PDCA.
- Improve plant layout and material flow to reduce waste and increase efficiency.
- Develop Just-In-Time delivery by set up internal logistic team (water spiders), implement supermarket and use Kanban system.
- Develop Build list for part fabrication by relate with production schedule. Also, develop Pick list for water spider to arrange part as kit to production.
- Reduce inventory and improve inventory control by use max-min control, confirm lead time with vendors, set up order point and make delivery schedule.
- Cooperate with HSE department to improve safety condition such as set up standard PPE required, morning talk & KYT, 5 minute exercise, 5S activity, fence & guard, ergonomics improvement and etc.
- Support Human Resource Development by set up organize and skill matrix for Production department.
- Set up training and workshop for both management and operation to have more understanding about Lean manufacturing.
- Use Floor Management Development System (FMDS) to improve operation daily management by collect and analyze the data, then set up the activities to solve or improve the issues.
- Control Cost by summarize and monitor purchasing data through Oracle, and monitor material usage through MATS (Materials Requisition System)
- Register and track assets within the Department. Also check and confirm assets condition annually.
- Set Cost reduction target, deploy to concern functions and follow up the activities
- Promote Cost Reduction Culture by set up Cost reduction ideas contest in the department
- Set up internal training program in order to make Human Resource Development
- Create material for training program to level up production staff skill such as power point presentation and VDO by using program Learning square Adobe MX Ulead, Dreamweaver, video studio 11 plus
KONKAN UNIVERSITY Konkan, Thailand
Internship program (March 2003 June 2003)
- Installation of computer equipment Operating System Network (LAN) and programs within the computer center.
- Create a project using PHP and ASP.
ประวัติการฝึกอบรม
กรกฎาคม 2559 ถึง กรกฎาคม 2559
HEIL TRAILER ASIA, LIMITED.
ISO 9001,14000,TIS18000
มิถุนายน 2550 ถึง มิถุนายน 2550
Toyota Academy Thailand
Basic TPS
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (พอใช้) อ่าน (ดี) เขียน (พอใช้)
ไทย 35 คำ/นาที อังกฤษ 30 คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,
- Operating system (Windows NT, Windows 95 XP,Windows 7-10)
- Microsoft office 2003 2016 (Word, Excel, Power point)
- Adobe Photoshop 7, Adobe Dreamwaver mx, Ulead video studio 11 plus , Learning square , PHP , Proshow Producer 5