Adminstrating factory and performing preventive maintenance planning for machinery and mechanic all equipment
Recommending on site preventive & curative scheduled maintenance to ensure optimum operation and a minimum of down time.
Referring preventive maintenance programs in the day to day operations as necessary.
Troubleshooting equipment and machines.
Checking and Recording repair requisitions and reporting on progress to the supervisor.
Providing documentation relating to all funtions performed by completing forms,reports,logs,and records.
Perform facility and machine maintenance Include other equipment
Control electric (design wiring system & piping ),(NDB Control ),( Electrical Building )
Air compresser system (cold Room 40 degree , -20 degree ),(Air conditioner Building)
Water supply /Waste system maintenance and operation for engineer system.
Managing the factory operation under ISO Procedures.
มีนาคม 2553 ถึง เมษายน 2556
ผู้จัดการฝ่ายผลิต /วิศวกรรม
เจเอ้มอุตสาหกรรมอาหาร
ลำลูกกา คลอง4
สำหรับสมาชิกเท่านั้น
- Setting Policy ,Action plan And Production Target With Relate Faction
- Controlling And Monitoring Process To Follow With Working Standard / Procedure
And Action Plan
- Over Seeing The Maintenance Faction For both Of Preventive And Corrective MTN.
- Coordinating With Relate Fuction Such as Sale ,Purchasing To Run Production Smoothly
And On Time Delivery
-Controlling The Quality Of Product And Coodinating With Quality Assurance Fuction
- Developing And Improving Production Process Or Machine To Increase Productivity
And Efficiency
-Engineering Control & Management
มกราคม 2550 ถึง มีนาคม 2553
Production Lean & Special Project Implement Senior Supervisor
ดีเอสเอ สยามวาลา
นิคมอุตสาหกรรมโรจนะ 2
สำหรับสมาชิกเท่านั้น
- Weekly production planning by manage effective production resources including rawmaterials And manpower to achieve production quantities,qualities,cost and down
- Supervisor and monitor employees work performance to ensure that all productions are
completed within the time line
- Initiate and direct procedures to increase production output
- Coordinate with planning , material control and engineering department for production
- Generate weekly performance report and summarize problem and solution regarding product
- quality,quantity,waste management and try to reduce human error,customers complaint and return product
Mr. Montri Chitchom
- LEAN Project Implement
* Production Level up
* One Piece Flow System & Kanban / Stock Work In Process Control
* Set-up Time Reduction
* Work Procedure Improvement
* Push => Pull System Implement
* Lay-out Improvement
* Manning & Machine Loading For Monthly & Weekly Plan Design
Work experience
1996-2007 :Thai Bridgestone Co.,Ltd.(Rangsit Plant,Pathumthani)
Position : Industrial Engineering
Department : Production Planning & Control Department
: Industrial Engineering Section
Job responsibilities
-To Calculate of M/C Loading & Manning Capacity For Monthly Production Plan.And Production Budget Loading & Manning Long term Plan
-To Calculate Of Cart & Equipments Needed For Material Handling To Support Production & For Production Budget.
-To Cooperate Concern Section On Analysis Production Efficiency Up & Reduce Non-Operation Time.(4M)
- M/C Lay-out Improvement & Design Before Setting & Take off For Productivity up
-Instructor To Fore Man Promotion & trainee (Capacity Gentan , Work Study)
ประวัติการฝึกอบรม
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (พอใช้) อ่าน (พอใช้) เขียน (พอใช้)
ไทย 30 คำ/นาที อังกฤษ 30 คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,รถจักรยานยนต์ ,
Qualification
Computer : Microsoft Office (Window XP, Excel) Power point,Internet ,Out look
: Be able to use English Language both speaking and writing
Activities
- Safety & Health , Suggestion,5K Activity,QC Circle
- Labour Relation / Morning Talk
Favorite Activity
Reading : Sport News,Technology and Science
Music : Acoustic,rock and pop music
Sport :Football,Tennis , Golf
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
- Productivity improvement by IE Technique From TPA (Thai-Japan)
- Extruder M/C Work Study & Time Study (Size change Time Reduce)At Indonesia
- Lean Six Sigma / Barcode Apply Management For Logistic & Supply Chain