- Make script NodeB configuration file according network design.
- Cooperate with customer and on site engineer to operate RNC/BSC in NOC to finish site Integration in the scheduled time window.
- Config the RET of site ,Test VSWR and RTWP of the sector and cell, distribute license of the site
- Document generation: script, Single site integration report, troubleshooting record
Alarm handing before PAC
- Establish and monitor the implementation of the Project Management Plan - Coordinate/ facilitate technical meetings with the Client
- Design the FTTX network following the client requirement and present
- Coordinate with technician and the client for troubleshoot the issue of network - Monitor and review project progress and deliverables to ensure that timescales and targets are met, risks are monitored and mitigated, and any KPIs set by the Client are successfully attained
- Provide PAT Document and information about the project to the customer. - Inspection network and report inspection result
พฤษภาคม 2558 ถึง มิถุนายน 2559
Transmission Engineering
Huawei Technologies (Thailand) Co., Ltd.
19Fl.Capital Tower, All Seasons Place,87 WirelessRd., Phatumwan, Bangkok
สำหรับสมาชิกเท่านั้น
- Training and cooperate with the customer for troubleshooting the network (ASON ,SDH ,NG DWDM)
- Planning to fix the Rectification and Precaution of the customer live network
- U2000 monitoring and inspection the customer network
- Provide the FAT/FAC Document
- Installation and upgrade the transmission equipment of the customer network
ประวัติการฝึกอบรม
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (ดี) อ่าน (ดี) เขียน (ดี)
ไทย 25 คำ/นาที อังกฤษ 27 คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถจักรยานยนต์ ,
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
- ระบบเฝ้าตรวจสถานะความปลอดภัยภายในรถยนต์ผ่านสัญญาณเอฟเอ็ม
- Thailand DTAC Evolution LTE Project 2017
- Thailand DTAC One Asia 3G&4G project