Job Description Construction and maintenance
1994 Construction, commissioning and start up of the ethylene plant project (14 MW).
- HV substation (Sub.E1c)
: 40/50 MVA 115/11 kV
- Steam turbine generator (35 MW)
- HV switchgear
- Motor Control Center
- Charger, UPS
2004 Install power backup from ETP to substation (Sub.E8) TF1 area (10 MW).
2005 Revamping of substation (Sub.E5) in TF1 area (5 MW).
Maintenance works
1. Induction Motor (380 V., 6.3 KV.) , Check vibration motor and Check SPM. , Replace bearing motor
2. Motor Operate Valve (MOV)
3. Motor control center (MCC)
4. Protection relay
5. Vacuum Circuit Breaker, Air Circuit Breaker, Transformer, 11 / 6.3 KV , 6.3 /0.38 KV. Capacitor Bank
6. Overhead crane , Cable Termination Electrical system
7. PLC. System, control cabinet of electrical system in substation, Air condition
(Check and installation)
8. Soot blower of boiler System
9. Grounding and Lightning System
10. UPS. And Charger system
11. Emergency Diesel Generator , Emergency Lighting system
12. Low Voltage and High Voltage system
13. Explosion Proof Equipment
14. Inspection of electrical system