( Power Plant)
-Responsible Operation
-Control boiler and steam tubine
-Generator 10 MW, Demine water plant, Cooling
tower
-Extraction to reheated
-Steam boiler (Chinese)
capacity-Max 65 tons/hr. Steam production
50 bar steam normal pressure
450 C Temp
53 bar design pressure
feed water temp 120 C
-Steam turbine (Chinese)
Generator capacity 12000 KW
-Demine water plant system
capacity-60 m³/hr
-All conveyers (Chain, Belt, Bucket)
สิงหาคม 2549 ถึง มิถุนายน 2553
Drilling Engineer
Aztec International Ltd.
ขอนแก่น
สำหรับสมาชิกเท่านั้น
(Drilling contractor)
-Drilling Engineer
-Measure design drill picp, casing pipe, tubing pipe
was a part of the award winning team for good
designs
Ability to develop and design new advanced
methods and techniques for maximum recovery
of oil and fuel
-Petroleum consultant to have enough knowledge of
the rocks ti's geologic formation and properties
having reservoir of natural gas and oik by
consulting with the geologist and petroleum
engineer
ประวัติการฝึกอบรม
มิถุนายน 2552 ถึง กรกฎาคม 2552
PanOrient energy Ltd. and Wichianburi hospital
Basic first aid and CPR
สิงหาคม 2542 ถึง กันยายน 2552
PanOrient energy Ltd and Aztec International Ltd. and PTTEP