Turn Key Category Working.
- Design Electrical System Following Requirement Client or Owner
- Take Off Material to Budget Bill of Quality
- Make Document Catalog Material for Approve
- Check Shop Drawing for Approve and Take Off Material for Purchase Order.
- Coordination Main Contractor and Subcontractor for Detail and Progress Installation
- Control and Monitoring Working to Target Follow Schedule
- Inspection Transformer ,MDB,Distribution Panel,Other Equipment for Installation
- Make Document Test Report Lighting ,Emergency,Grounding&lighting Arrester,Public Address,Fire Alarm,Lan-Computer, High-volt Equipment.
PROJECT REFERENCE
- Marui Factory ,304 Industrial Estate.
- Endo Factory ,Gate Way Industrial Estate.
- Nidec Copal Factory, Navanakorn Industrial Estate.
Bidding Category Work
-Make Document Addition Reduction by Comparison Reference Bill of Quality , Main Contract Bidding ,Existing Drawing Design
-Compile Document Component Site Instruction,Shop Approve,Memo,Email, About Other Document.
-Coordination Consultant and Owner for Addition Reduction Work.
PROJECT REFERENCE
- Central Rama 3 (Smoke Vent)
- Central Bangna (Smoke Vent)
- Central Ramintra (Smoke Vent)
- Central Chiangmai (Smoke Vent)
Bidding Category Work
-Take Off Material Make Budget Bill of Quality
-Cost Control Material
-Coordination Consultant and Owner Progress Report
-Make Document Work Permit , Weekly Report, Monthly Report
-Control and Monitoring Subcontractor Working Follow Schedule.
PROJECT REFERENCE
- Head Office Insurance OIC. Ratchada 32 Bangkok.
- Branch Office Insurance OIC.Nakornratchasima.
- Branch Office Insurance OIC.Bangna.
- Office Quality Cids Silomcomplex Building Bangkok.
Lasted.
2560-2561
- Design M&E System Electrical ,Fire Alarm ,Sanitary, Fire Protection ,Aircondition and Take Off Material for Make Bill Of Quantities Budget Cost. Bidding for Office ,Factory ,Wharehouse & Other Bld.
- Gogreen Advisory Co.,Ltd. Position Project Engineer Responsibility Solar Rooftop Installation ,Design Take Off Material ,Control & Monitoring,Coordinate Owner and Supplier
Project Installation : Taymuang Ice Factory (1000Kw)
Thairigid Plastic Factory (100+400Kw)
BCF Granwood Factory (200Kw)
Zubb steel Factory (100Kw)
2557-2560
Contractor Electrical Power and Comunication Installation, Description Of work Check &Submisson Project ,Planning Manpower Follow Schedule,Control and Monitoring Progress installaton ,Check Safety of work & Standard Installation,Hand Over
Project Installation : Premier Inn Sukhumvit Soi11 Hotel
Adelpai Sukhumvit Soi 49 Hotel
Najomtain Landscape Street Light
ประวัติการฝึกอบรม
กุมภาพันธ์ 2556 ถึง มีนาคม 2556
Kasetsart University Fire Engineering
Building Inspector
กุมภาพันธ์ 2556 ถึง กุมภาพันธ์ 2556
Safety and Health at Work Promotion (Thailand)
Safety Officer
พฤศจิกายน 2555 ถึง พฤศจิกายน 2555
Engineering Institute of Thailand
Improvement Power Factor and Harmornics.
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (ดี) อ่าน (ดี) เขียน (ดี)
ไทย 35 คำ/นาที อังกฤษ 30 คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,
computer,internet ,autocad 2007,microsoft word,excel,licence Profession of Engineer
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
Won First Runner of the Invention Completion Project 2007 THE ELECTRIC BICYCLE EXERCISE. AT Sripatum University.